涩涩视频网,天天骑夜夜操,手机在线视频一区,天天操夜夜叫,久久靠逼视频,久久www免费人成看片好看吗,婷婷午夜激情网

Home  -   Company News  -   Details
The Macao Organic Resources Recycling Center project officially starts construction.
Release time:2025-02-12
Page View:275
Source:

On February 11, 2025, the groundbreaking ceremony of the Macao Organic Resources Recycling Center project was successfully held at the project site. Leaders of the Macao Environmental Protection Bureau, Ma Youli, the Honorary President of the Macao General Chamber of Commerce and a member of the Standing Committee of the 13th National Committee of the Chinese People's Political Consultative Conference, and his wife Yan Wanming, Ma Zhiyi, the Executive Director of the Amax Construction Group Co., Ltd., Shan Jianming, the Chairman of the Board of Directors of the Maxda Group, and his wife Bao Fengjiao, Li Fei, the Assistant General Manager of China Railway No.1 Engineering Group Co., Ltd., Tang Leping, the General Manager of Tsinghua Tongfang Environment Co., Ltd., Kuang Bin, the General Manager of Wangneng Ecology, and leaders and representatives of all parties of the consortium attended the ceremony.


640.webp.png


The Macao Organic Resources Recycling Center project, with the mission of "green development and circular economy", actively responds to the national "dual carbon" strategic goal. By adopting internationally advanced treatment technologies, it converts organic waste such as kitchen waste into clean energy and organic fertilizers, truly achieving "turning waste into treasure". The implementation of this project is related to the urban image of Macao and the quality of life of its residents, and embodies Maxda's infinite vision for a better future.


640.webp (2).png


The successful holding of the groundbreaking ceremony marks the official entry of the Macao Organic Resources Recycling Center into the construction phase.


640.webp (1).png


Introduction to the Macao Organic Resources Recycling Center Project


640.png


This project adopts the EPC+O (Engineering, Procurement, Construction + Operation) model, with a total contract amount of 1.867 billion patacas. With the design theme of "Future Floating Island, Sky Garden", it integrates the "island" concept of Macao and showcases the "core" of technology. The project plans to adopt the treatment process for kitchen waste of "high - efficiency pretreatment + anaerobic digestion + biogas power generation + aerobic composting", and the sewage treatment process of "pretreatment + aerobic treatment + anaerobic ammonium oxidation (DA)". It features forward - looking design, advanced technology, resource recycling, energy conservation, and environmental protection. In close cooperation with partners, the company has fully demonstrated its professional strength and profound heritage as a leading enterprise in the solid waste industry, and played a key role in providing the main process design and core technology.


The project is designed to handle 150 tons of kitchen waste, 230 tons of toilet wastewater, and 190 tons of grease wastewater per day. After completion, it will significantly reduce the treatment of local kitchen waste in Macao, promote resource recycling, improve the local living environment, and safeguard the safety of food for the people of Macao.


望城县| 临夏县| 安国市| 南通市| 界首市| 彩票| 旺苍县| 关岭| 浦东新区| 宁夏| 南京市| 大庆市| 安化县| 桓台县| 砀山县| 富阳市| 桓仁| 鸡西市| 翁源县| 沂源县| 万州区| 东平县| 云南省| 乌鲁木齐县| 建瓯市| 铅山县| 永德县| 颍上县| 大足县| 丘北县| 桦川县| 长春市| 富蕴县| 蚌埠市| 双江| 和静县| 济南市| 定边县| 友谊县| 东至县| 搜索|